An owner in Fontana, CA was required to capture close to 157,000 GALLONS of stormwater runoff on the site where apartment complexes were being constructed. Because of tight space constraints, Whitson Contracting & Management and CA Filtration Specialists were able to design and build a decentralized system to include three tanks in total. By sequencing the installation of these AquaSave tanks, the contractor was able to flip-flop construction operations allowing for a cooperative schedule throughout project completion.