FocalPoint Installation in Orange County, CA

A large FocalPoint system was built in Orange County, CA at the same time that the construction of a housing development was occuring. Because of this, large sediment loads prevented the system from functioning properly. Whitson CM worked with CEC to design an adjacent structure with more robust sediment control and dissipation capabilities. Following the […]
157,000 GALLONS of stormwater runoff

An owner in Fontana, CA was required to capture close to 157,000 GALLONS of stormwater runoff on the site where apartment complexes were being constructed. Because of tight space constraints, Whitson Contracting & Management and CA Filtration Specialists were able to design and build a decentralized system to include three tanks in total. By sequencing […]