Burrtec Waste
Scope of Work:
Retrofitted two Burrtec Waste facilities that were completed under budget and by the completion date in 2014.
The work included:
1) Infiltration Basins.
2) Trench Drain Installations.
3) Wet Utilities.
4) Containment Berms.
5) Paving and Concrete Flatwork.
6) Storm Drain Filtration.
This 2015 summer, Whitson CM will be assisting Burrtec Waste with additional site development and CM on several more projects throughout Southern California.