Europa Village in Temecula
WCM was brought on to oversee the development of a 27-acre site development at Europa Village in Temecula.
WCM was brought on to oversee the development of a 27-acre site development at Europa Village in Temecula.
Whitson CM is improving the strength and lifespan of roadways throughout the southwest United States by installing Fiber Reinforced Asphalt Concrete, ACE Fiber. ACE Fiber is being installed in Palm Desert, CA, because of its increased lifespan and thermal cracking resistance.
Whitson CM will continue to provide stormwater and environmental engineering services to the City of Thousand Oaks. WCM has been deemed qualified by the City to perform On-Call Professional Engineering Services. Scope of Work: The contract will begin this year and expire in 2020. We will add updates when future projects occur. Previous Project Highlights: […]
Industrial Facility: Pulltarps Manufacturing, El Cajon, CA Whitson CM’s most recent industrial BMP installation occurred at Pulltarps Manufacturing in El Cajon, California. Two of the site’s sample locations are located at the site entrance and exit. During a rain event, stormwater discharges from the site via sheet flow. In order to capture and filter the […]
Scope of Work: Whitson CM has been selected as the Construction Manager for the 300 acre Europa Vineyard Estates project in Temecula Valley Wine Country. The project is located NE of the intersection of Rancho California Road and Butterfield Stage Road. Whitson CM developed the specifications for each trade according to their scope of work […]
Construction Management Project: 950 Industrial, Chula Vista, CA Scope of Work: Whitson CM has been selected as the Construction Manager for a 2 acre Commercial and Industrial project in Chula Vista, CA. The project is located along Industrial Blvd and the 5 Freeway. Whitson CM is currently in the process of developing the trade specific […]
WCM has recently entered into a contract with the City of Thousand Oaks to assist them with their NPDES and MS4 compliance activities. One of the City’s goals is to eliminate trash from storm drain systems in the City. However, costs must be strongly considered when generating a plan to meet the Permit requirements. While […]
Year of Completion: June 2015 Scope of Work: Construction Site Management of a 20 acre high-end housing development in Del Mar overlooking the ocean. Whitson CM developed a multi-prime contracting system and for on and off-site improvements.
Scope of Work: Whitson CM has teamed up with the prime contractor for the installation of Solar Photovoltaic structures in the form of carports and lunch shelters at 32 sites within the Newport-Mesa Unified School District. Whitson CM was chosen as a partner because of our level of experience and extensive knowledge with solar power. […]
Year of Completion: December 2014 Scope of Work: Whitson CM was hired by the City of San Marcos to stabilize 20 acres of the City’s parcels that were burnt in the Coco’s fire. The parcels needed to be stabilized for environmental and safety requirements before the beginning of the winter rains. The work was finished […]